█ Description:
The most effective approach to power and thermal load testing during commissioning that we have found is to utilize rack-mounted load banks (Figure 2). These are resistive heating element load bank units that mount in typical 19” server racks, plug into dual-circuit rack PDUs (power distribution units), and can be dialed-in to the expected load of the particular rack. In this manner, the full load rack configuration can be simulated, as well as some partial theoretical/planned initial buildout. The fact that the loads can be configured to match expected loads, and at specific locations, can have a number of benefits to more representative testing. For example, hot aisle hot spots can be better detected, resulting from either airflow variations within the hot aisle or, perhaps, based on variations in performance by in-row cooling hardware. Further, N+1 testing of cooling equipment can be accurately simulated. If, for example, a data center is designed to to have 10 in-row cooling (IRC) units, but only requires 9 operational to meet heat rejection loads (i.e. 9 + 1 = 10), during design load testing, a single IRC can be failed and the hot aisle can be evaluated to determine if unacceptable hot aisle temps result near the failed IRC unit. Performing this kind of testing with floor load banks would be inconclusive at best.
Friendly Notice: we are willing to provide customized products for our customers with their logo.
Using Application: Data Center, Generator, UPS power supply, Inverter, project debugging, Laboratory, etc.
█ Parameters:
Rack Mounted Load Bank table sheet TWLB-AC220V/6KW |
|
Rated Voltage | AC220V(±10%)single phase |
Rated Power | 6KW |
Frequency | 50Hz/60Hz |
Power step | 100W、200W、200W、500W、1KW、2KW、2KW |
Control way | Manual circuit breaker control |
Display | Voltage, current LED display |
Power fact | PF1.0 |
Accuracy | ≤±5% |
Display accuracy | 0.5 |
Control power suppluy | AC220V/50HZ |
Level of protection | IP20 |
Cooling way | Forced air, forward wind, backward wind |
Color | Depending on customers |
Dimension | W460*D600*H270mm |
Weight | 30KG |
Environment parameters | |
Working temperature | -10℃~+55℃ |
Relative humidity | ≤95%RH |
Altitude | ≤2500 |
Pressure | 86~106kPa |
Rack Mounted Load Bank table sheet TWLB-DC650V/4KW |
|
Rated Voltage |
DC650V |
Rated Power |
4KW |
Power step |
100W,200W,200W,500W,1KW,2KW |
Control way |
Manual circuit breaker control |
Display |
Voltage, current LED display |
Accuracy |
≤±5% |
Display accuracy |
0.5级 0.5 degree. |
Control power supply |
AC220V/50HZ |
Level of protection |
IP20 |
Cooling way |
Forced air, forward wind, backward wind |
Color |
Depending on customers |
Dimension |
W460*D600*H270mm |
Weight |
30KG |
Working temperature |
-10℃~+55℃ |
Relative humidity |
≤95%RH |
Altitude |
≤2500 |
Pressure |
86~106kPa |
Optional function |
PC control or HMI control |
Remarks |
For customizing products |
Product detail pictures:
Related Product Guide:
We strive for excellence, services the customers", hopes to be the top cooperation team and dominator business for personnel, suppliers and prospects, realizes benefit share and continual promotion for One of Hottest for Generator Load Bank Test - Rack Mounted Load Bank for data center, UPS – Wepower , The product will supply to all over the world, such as: Madagascar, Sierra Leone, Albania, With more and more Chinese products around the world, our international business is developing rapidly and economic indicators big increase year by year. We have enough confidence to offer you both better products and service, because we are more and more powerful, professional and experience in domestic and international.
By Priscilla from Manchester - 2018.07.26 16:51
After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
By Roland Jacka from Bangladesh - 2018.07.27 12:26